Materials    
 
Introduction
> Why build a cabinet?
> Cost
> Tools
> Materials
Game Day
Starting
Cutting the sides
Building the Base
Attaching Base/Shelf
Stand it Up
Back Beams
Ledger Boards
Add Back
The Monitor shelf
Casters
Patching and Sanding
Priming and Painting
T-Molding
Drawer Construction
Installing the Door
Door lock
Wiring Coin Door
Speaker Area
Marquee
Monitor Bezel
Appendix
 
 

 

I found it was best to gather all your materials, other than wood and paint, well before your construction day. You will never get everything you need in one trip and it is annoying to have to stop to make a Lowes run. Some items will need to be shipped, which adds time.  I gathered items for three weeks prior to the first day of construction. 

Click here for the complete material list.

 

   
 <<<- Tools   Game Day ->>>  

Home | Introduction | Material List | Control Panel | Links | Cabinet Plans 2
All Content © 2003-2013 Mike Trello